The Type XXI U-boat featured a streamlined shape, which allowed for greater underwater speed and efficiency compared to earlier submarine designs that were primarily optimized for surface travel.
Its revolutionary approach to underwater performance influenced post-war submarine development worldwide, including the U.S. Navy’s decision to focus on fully submerged operations.
Nautilus benefited from the Greater Underwater Propulsion Power (GUPPY) improvements to the American Gato-, Balao-, and Tench-class submarines.
[citation needed] Nautilus's keel was laid at General Dynamics' Electric Boat Division in Groton, Connecticut, by Harry S. Truman on 14 June 1952.
This design is the basis for nearly all of the US nuclear-powered submarine and surface combat ships, and was adapted by other countries for naval nuclear propulsion.
[citation needed] Nautilus returned to New London, Connecticut, on 21 July and departed again on 19 August for her first voyage of 1,200 nmi (2,200 km; 1,400 mi) under the polar pack ice.
Thereafter, she headed for the Eastern Atlantic to participate in NATO exercises and conduct a tour of various British and French ports where she was inspected by defense personnel of those countries.
[citation needed] In response to the Soviet Union's successful launch of Sputnik, President Eisenhower ordered the U.S. Navy to attempt a submarine transit of the North Pole as a technological showpiece.
[citation needed] The trip beneath the ice cap was an important boost for America as the Soviets had recently launched Sputnik, but had no nuclear submarine of their own.
[26] As Nautilus proceeded south from Greenland, a helicopter airlifted Commander Anderson to connect with transport to Washington, D.C. At a White House ceremony on 8 August, President Eisenhower presented him with the Legion of Merit and announced that the crew had earned a Presidential Unit Citation.
[27] At her next port of call, the Isle of Portland, England, she received the Unit Citation, the first ever issued in peace time, from American Ambassador JH Whitney, and then crossed the Atlantic reaching New London, Connecticut, on 29 October.
[citation needed] Following fleet exercises in early 1959, Nautilus entered the Portsmouth Naval Shipyard in Kittery, Maine, for her first complete overhaul (28 May 1959 – 15 August 1960).
Overhaul was followed by refresher training and on 24 October she departed New London for her first deployment with the Sixth Fleet in the Mediterranean Sea, returning to her home-port on 16 December.
[citation needed] Nautilus spent most of her career assigned to Submarine Squadron 10 (SUBRON 10) at State Pier in New London, Connecticut.
[citation needed] Nautilus operated in the Atlantic, conducting evaluation tests for ASW improvements and participating in NATO exercises.
[citation needed] On 2 May 1966, Nautilus returned to her homeport to resume operations with the Atlantic Fleet, and at some point during that month, logged her 300,000th nautical mile (560,000 km; 350,000 mi) underway.
[33] For outstanding achievement in completing the first voyage in history across the top of the world, by cruising under the Arctic ice cap from the Bering Strait to the Greenland Sea.
The skill, professional competency and courage of the officers and crew of Nautilus were in keeping with the highest traditions of the Armed Forces of the United States and the pioneering spirit which has always characterized the country.
[37] Following an extensive conversion at Mare Island Naval Shipyard, Nautilus was towed back to Groton, under the command of Captain John Almon, arriving on 6 July 1985.
Despite similar alterations to exhibit the engineering spaces, tours aft of the control room are not permitted due to safety and security concerns.