It was opened on 15 June 1971 as part of a 4,220-metre (13,850 ft) toll road originally numbered T3.
[1] It was the first tunnel to be built with a jet-fan longitudinal ventilation system.
[2] On 22 July 1989 this road, built to complement the SS 225, was renumbered and part of the SS 225 was renumbered SP 77.
This article about transport in Italy is a stub.
You can help Wikipedia by expanding it.This European tunnel-related article is a stub.