Bayview station (Ottawa)

An infill station on the Transitway between Tunney's Pasture and LeBreton (now Pimisi), with a pair of elevated bus platforms at the western end of Albert Street, openend the same day.

[citation needed] On January 17, 2016, the transitway platforms closed for conversion to light rail, with all buses diverting via Albert Street.

The station reopened on September 14, 2019, as an intermediate stop on the first phase of the Confederation Line, making Bayview an important rapid transit transfer point.

[2][3] On September 16, 2017, the eastbound bus stop of Bayview station was moved 300m west to facilitate the construction of the Trinity Development at 900 Albert Street.

It is intended as a catalyst for large redevelopment including condos, hotels and the city's future tallest office and residential tower at 900 Albert.

Platforms and pedestrian bridge at Bayview, built during Stage 2 construction