[8] It allowed cross-city rail services to operate through Snow Hill, and freed up much needed capacity at New Street station.
Chiltern Railways run services to London Marylebone in the morning rush hour, which start from Stourbridge Junction rather than Moor Street, and reverse journeys during the evening.
Even after the Snow Hill reopening a lower level of service to New Street was maintained, but this link was axed altogether at the May 2004 timetable change, to much local consternation.
This did however add much needed extra capacity to the Stour Valley Line into Birmingham New Street and free up platform space there.
The line from Worcester Shrub Hill continues to Cheltenham Spa railway station, which is the next calling point for most CrossCountry services, and thus offers a convenient alternative when the Lickey Incline is closed.
Several charter trains can often be seen on the line due to the existence of the Severn Valley Railway which has a mainline connection at Kidderminster.