Braes of Doune Wind Farm is a wind farm located close to Stirling, Scotland and opened in 2007.
The farm was built by Alfred McAlpine in 2007 and handed over to Airtricity to operate.
An agreement was reached with Centrica, the owners of Scottish Gas, to purchase energy output from the farm.
The farm has 36 Vestas V80 2.0 megawatt wind turbines with a total capacity of 72MW.
You can help Wikipedia by expanding it.This article about a British power station is a stub.