The Breakfast Creek Green Bridge is a pedestrian and cycle bridge over Breakfast Creek in Brisbane, Queensland, Australia.
The bridge connects Newstead Park at Newstead to the Lores Bonney Riverwalk in Albion in the inner north east of the city.
The bridge design is a tied arch bridge with two different arch spans 67 metres and 89 metres inclined and supported together.
[1] Construction was being undertaken by Georgiou Group.
[2] The bridge was completed in early 2024 and opened on 10th February 2024.