Central Electricity Authority (India)

[1]: 259  The CEA is also responsible for concurrence of hydro power development schemes of central, state and private sectors taking into consideration the factors which will result in efficient development of the river and its tributaries for power generation, consistent with the requirement of drinking water, irrigation, navigation and flood control.

Similarly, transmission / distribution licensees need not implement compulsory the standards for construction of electric lines except the Grid Code/ Grid Standards for the operation and maintenance of transmission lines specified by CEA under clause 73 (d) of this Act.

Many times, these CEA standards are conservative compromising optimum design features /cost/ utility and also do not give full clarity in selection of the system / sub system capabilities of electrical plants and electric line.

The eastern, western and north-eastern grids have been integrated and are operating in a synchronous mode.

It also advises state governments, licensees or generating companies on matters which enable them to operate and maintain the electricity system under their ownership or control in an improved manner.