In 2017, a modular movable stand was assembled on the Eastern side, designed to serve either the main stadium or the secondary artificial pitch, including a mixed in-between modification.
Following this, construction on the main stand commenced on the West edge in 2017 and concluded in 2021 with the inauguration of the new Main stand, boasting over 2,000 seating capacity, marking the stadium's official reopening.
[2] Subsequently, in the same year, a second reconstruction of the opposing Eastern stand commenced, with a construction of the permanent tribune with additional 1,136 bucket seats, distributed between the both pitches.
[1] The stadium hosts football matches, regional athletics events, strength sports, etc.
The stadium also has hosted some cultural events[citation needed].