Plans for the Regents Canal, from Paddington to Limehouse were eventually agreed, and an Act of Parliament to authorise construction was obtained on 13 July 1812.
[1] The canal opened as far as Camden Town in 1816, but a ridge of higher ground lay between this point and City Road Lock, through which a 960-yard (880 m) tunnel had to be driven.
One of the main events of the opening ceremony was the arrival of boats from Manchester, which passed through the lock to reach City Road Basin immediately to the east, discharged their cargoes, and set off again to return to the north.
This made operation of the locks more complex, and so they were permanently manned during the heyday of the canal, with lock-keepers working a shift system to provide 24-hour cover.
As the use of the canal declined, in part due to railway competition, manning levels were reduced, and padlocks were used to prevent operation of the locks at the weekends.