City of London Pedway Scheme

First devised as part of the post World War II reconstruction plans for London, it was put into effect mainly from the mid-1950s to the mid-1960s, and had been largely mothballed by the 1980s.

Enthusiasts for the scheme saw an opportunity to put it into practice through the post-war reconstruction programme, and in 1947 architect Charles Holden and planner William Holford developed a blueprint that envisaged a network of first-floor walkways that would connect buildings across the City.

The reason for its ultimate demise were escalating costs and the increase in influence of the conservation lobby, which opposed the extensive redevelopment of the historic areas of the City.

The most extensive part of the network to be completed was in the Barbican Estate and surrounding streets; the main entrance to the Museum of London is, to this day, at first-floor level.

Pedways (and pedestrian tunnels) have been more successfully implemented in other parts of the world especially where fully enclosed connections allow year-round use even during inclement weather.

Bauhaus bridge in Dessau, Germany, designed by Walter Gropius (1925)