Construction was expected to start on 17 February 2011, and the first phase was scheduled to be within two years.
[2] The current status of the project is uncertain as the work never commenced as planned.
The remaining 30 per cent is categorised as a non-processing zone and will feature shopping malls, convention centres, apartment complexes and other lifestyle needs, developing it into a full-fledged township.
[3] The first phase consists of a built-up space of 1,000,000 sq ft (92,900 m2), to be built in two years.
[4] The proximity to the SAFE and SEA-ME-WE 3 cables dropping zone and direct optical fibre link to the gigabyte router of VSNL, enables the park to offer 100% uptime data connectivity to units.