D4 motorway (Slovakia)

[4][5] For decades, there was only a short stretch from Austrian border at Jarovce to the junction with D2 (part of the former D61), construction of which started in 1996 and was opened in 1998.

The connecting motorway on the Austrian side, Nordost Autobahn A6 was opened on 19 November 2007.

In 2016, the construction began of the 27-kilometre-long (17 mi) motorway section from the D2xD4 junction near Jarovce to Bratislava, Rača[citation needed].

[8] On 24 November 2024, the slip road at Bratislava-vychod was put into operation, in the direction of D1 towards Trnava.

[11][12] Kilometrage end point Content in this edit is translated from the existing Slovak Wikipedia article at sk:Diaľnica D4 (Slovensko); see its history for attribution.