[3] To address this, multiple blasting operations were conducted to remove isolated boulders before earth excavation began in June 2015.

As a result, during construction, the pipe well method was used to lower the groundwater level while controlling settlement around the station's surrounding areas.

By the end of June, the barricaded area was reduced to minimize disruption to surrounding road traffic.

[9] In July 2020, workers carried out contact wire replacement operations at the station due to excessive wear.

Before Line 1 started trial operations, an environmental enhancement project was carried out on an area of over 4,000 square metres (4,800 sq yd) near Exit 5.