Elkhart Central High School

The Elkhart Central High School building was designed and built by Everett I.

Accordingly, the building features lecture halls, seminar rooms, and departmental office areas.

As part of the remodeling, every classroom was wired and equipped for voice, video, and data.

In the fall of 2021, the system underwent a change where students in grades 10 through 12 will attend classes on California Road at the former Elkhart Memorial (west campus)and Elkhart Area Career Center buildings, with the addition of new music rehearsal space and a new building to house technology programs.

Students in grade 9 attend classes at the former Elkhart Central High School (Known as the Freshman Division) on Blazer Boulevard.