Additionally, the Pacific Gas and Electric Company releases Upper Feather water into the Hyatt Generating-Pumping Plant for hydroelectric generation during daily peak demand.
The East Branch Feather Watershed (USGS huc 18020122) is the middle watershed of the headwaters of the Feather River basin and includes the American and Indian valleys.
[9] The 1849 California Gold Rush brought thousands of prospectors and settlers to the region.
[9] Operations at the Lime Saddle and Coal Canyon hydroelectric powerhouses along the North Fork began August 1, 1906, and December 24, 1907.
[10] The 1909 Feather River Route was built through the Feather River Canyon along the North Fork and East Branch and crossed under the mid-Sierra drainage divide between the East Branch and Middle Fork watersheds via the Spring Garden tunnel.