The War Office promised General Edmund Allenby, Commander in Chief of the Egyptian Expeditionary Force (EEF), substantial reinforcements after his successful capture of Jerusalem.
[6] The French, however, imposed an important qualification to Joint Note 12 which gave qualified approval for a decisive offensive against the Ottoman armies; no British troops in France could be deployed to the EEF.
[6] General Jan Christiaan Smuts, a member of the Imperial War Cabinet, had been sent to Palestine in early February to confer with Allenby regarding the implementation of Joint Note No.
[16][18] T. E. Lawrence and the forces of the Arab Revolt based on Aqaba had blown up lengths of rail track, bridges and Ottoman supply trains with explosives.
In response the Ottoman Army sent a strong force including a German infantry battalion south from Amman to defend the railway and the important town of Ma'an.
1 Squadron AFC reconnoitred El Kutrani and reported a camp of 150 tents, 14 large dumps, 150 rolling stock including three trains and seven gun positions south-west of the station.
[21] The establishment of a bridgehead on the east bank of the Jordan River and the advance to Es Salt and Amman was to be preceded by diversionary attacks across the entire front and coordinated with an Arab raid led by T. E. Lawrence on the Deraa Hejaz railway station.
[5] Allenby ordered the infantry Major General, John Shea commander of the 60th (London) Division, to cross the Jordan River and attack Es Salt and Amman.
[22][23] The aim of these attacks was to destroy or damage a long viaduct and tunnel near Amman on one of the Ottoman Empire's strategically important lines of communication – the Hejaz Railway.
[45] The attacking forces lines of communication began at the Jerusalem railway station where supplies were offloaded on to lorries and driven to Jericho and later to the Jordan River 30 miles (48 km) away.
Many were drowned when Asim's German and Ottoman defenders opened fire on barges made of wood and tarpaulins stretched over framework which became waterlogged after being holed by gunfire.
Despite being hampered by dense jungle and Ottoman machine gun fire during the day together with artillery which bombarded the slopes, an infantry brigade crossed the river and during the night the bridgehead was pushed out.
[74][75] The infantry division followed the sealed metal road from the Ghoraniyeh crossing 6 miles (9.7 km) across the Jordan Valley before reaching the Shunet Nimrin defile at the foot of the hills of Moab.
[72][79] From Shunet Nimrin the road winds along the side of the desolate hills bordering the Wady Shaib to begin an 11-mile (18 km) climb in a north easterly direction towards Es Salt 2,050 feet (620 m) above sea level.
[41] This southern route via Naaur was the most difficult with a steep grade and the track was narrow, rocky and slippery being only wide enough for horses to move in single file and many camels, their hoofs better suited to sand, frequently slipped and fell.
[62] The New Zealanders reached Air es Sir at noon capturing two Ottoman officers and 48 other ranks and at 13:30 the brigade concentrated at the cross roads above the town.
[31] The weather was atrocious; sleet and heavy rain continued for almost the entire operation making the roads and tracks soft and boggy and all supplies of rations and forage had to be sent up to the advancing troops on camels and pack-horses.
[61][87] By this stage the advance had been on the march continuously for three days and nights and owing to the exhaustion of the men and horses, Chaytor, commander of the mounted division, postponed the attack on Amman until the next morning.
The British infantry reinforcements were delayed near Suweileh by local fighting between Circassians and Arabs, while a Royal Horse Artillery (RHA) Battery also moved from Es Salt towards Amman with great difficulty, arriving on the last day of battle.
[42][94] The counterattack by German and Ottoman forces from the direction of Nahr ez Zerka to the north of Jisr ed Damieh on the eastern side of the Jordan Valley continued to threaten Shea's and Chaytor's northern flank.
[28][94][95] By 30 March the 1,800 rifles and sabres of the 145th Regiment (46th Division) from the Ottoman Seventh Army based at Nablus, which had crossed the Jordan River at Jisr ed Damieh to attack Kufr Huda the day before, were arriving near Es Salt and threatening the occupation of the town by Shea's force.
On 24 March a large troop-train at Lubin station on the Hejaz Railway south of Amman was attacked by aircraft with machine-guns; 700 rounds were fired into the enemy troops.
A divisional collecting station was established 6 miles (9.7 km) further back at Birket umm Amud to which wounded were carried in cacolet camels; the journey taking between six and seven hours.
In the rear of these divisional collecting stations, the road through Suweileh and Es Salt to El Howeij 5 miles (8.0 km) was passable by wheeled transport and the remainder of the journey to Jericho was in motor ambulances.
By 30 March Chaytor's force had pushed infantry in the Ottoman 48th Division back into Amman and after desperate fighting the New Zealand Mounted Rifles Brigade had entered the town 2 miles (3.2 km) west of the station, but German and Ottoman machine guns positioned on the hills beyond were too strong and all efforts to dislodge enemy forces from the Hejaz Railway's Amman station failed.
[89] When darkness fell on 30 March, the front line troops received the order to retreat and an infantryman concluded: "none of us sorry to leave behind forever, we hope, a nightmare of a most terrible nature.
[99][106][Note 15] From Es Salt, thousands of Armenian and Bedouin refugees and others joined the withdrawing columns carrying their belongings on their backs or pushing them in carts, some of the aged and footsore given a lift in the horse-drawn limber wagons.
By 23:00 all wounded had been started on their journey back to the Jordan Valley and the New Zealand Mounted Rifles Brigade commenced to recross the Wadi Amman at midnight; reaching the cross roads at 04:00 on 31 March.
It was well after daylight on the morning of 1 April, before the New Zealand Mounted Rifles Brigade; the rearguard was able to start retiring again, while being fully occupied in holding off advanced German and Ottoman troops.
All was peace and warmth and quiet, making it difficult to think that a few short hours before, the winds were raging, rain falling, and a bitter battle in progress.The withdrawal across the Jordan River was completed by the evening of 2 April leaving bridgeheads at Ghoraniye and Makhadet Hajlah.