[1][2] Abu Dhabi Water & Electricity Authority (ADWEA) - Now called as Abu Dhabi Energy Company (TAQA) selected International Power, now called as Engie Energy International and Marubeni Corporation to build the project in 2007.
[1] The Fujairah F2 IWPP has an installed power capacity of 2,000 MW and it produces 591,500 cubic meter of water per day.
455,000 cubic meter of water per day is produced using multiple-effect distillation (MED) technology and 136,500 cubic meter of water per day is produced using reverse osmosis technology (RO).
[5] The plant is owned by the Fujairah Asia Power Company (FAPCO), established on 23 October 2007.
The shareholders of FAPCO are:[1] The plant will be operated by Fujairah F2 O&M Company Limited, an equal based venture between International Power and Marubeni.