The Fulmar Oilfield is situated 312 km east of Dundee, Scotland, United Kingdom in block number 30/16 and 30/11b.
At this time Talisman also purchased the equity of the other partners ExxonMobil and Amerada Hess.
This platform is a steel, 8 legged jacket designed by McDermott Engineering and constructed at Nigg, Easter Ross, Scotland.
[4] The topsides facilities included capability to drill, produce, meter, pump oil and gas.
The Medora Floating Storage Offloading (FSO) vessel broke free on the evening of 24 December 1988 narrowly missing the BP operated Clyde platform in the process.