GEMSS mine system

With an empty weight of 4,733kg, when fully loaded with 800 mines (a process which could take up to 20 minutes) the system weighed 6,364kg.

[3] Four Flippers were assigned to each unit with an M128, or to platoons operating as part of light forces.

[4] Three Flippers operating together could lay a minefield of the same size and density as one laid by an M128 in the same amount of time.

Arming as it travels through the air, the mine would deploy four tripwires when it came to a rest on the ground.

In terms of arming, functioning and storage it was the same as the M74, however instead of deploying tripwires it would explode if a vehicle passed over it.

M74 AP mine.
M75 AT mine.