[1] The 4.4 kilometres (2.7 mi) long and four-lane flyover was inaugurated by Chief Minister of West Bengal Mamata Banerjee on 9 March 2018.
[2] Flyover connecting Brooklyn crossing, close to Ramnagar at the Garden Reach end and terminating near Majherhat railway station.
The four-lane flyover that has been set up by the Kolkata Metropolitan Development Authority (KMDA) at a cost of Rs 340 crore.
[4] Chief Minister Mamata Banerjee at a ceremony in Khidirpur in the morning, witnessed a severe traffic congestion on Garden Reach Road.
A Central Government firm RITES was appointed to prepare a Detailed Project Report (DPR).