The main purpose of the dam is flood control, irrigation and hydroelectric generation.
The dam and the attached power house were built in years 1976-1981 by the then Yugoslav company GIK Hidrogradnja (of Sarajevo, now Bosnia-Herzegovina).
All the equipment (gates, turbines, generators) were also supplied by the then-Yugoslav companies.
Sites that were excavated as part of this operation included Tell Madhur, Tell Rashid, Tell Saadiya, Tell Yelkhi, and Tell Abada.
You can help Wikipedia by expanding it.This article about a dam or floodgate in Asia is a stub.