It became operational in March 2006[1] and has five 1.5 MW turbines built by General Electric.

[2][3] The wind farm is onshore at the Atlantic County Utilities Authority (ACUA) Wastewater Treatment Plant on U.S. Route 30 and is visible from highways approaching Atlantic City.

The treatment plant uses approximately 50% of the wind-generated capacity from the wind turbines, providing about 60% of the wastewater plant's electricity needs, with the remaining energy being provided to the main power grid for resale as premium renewable electricity.

ACUA claims that the wind farm has "saved more than $7.3 million in energy costs and prevented 74,777 metric tons of CO2 from entering the atmosphere since its opening.