NextEra Energy Resources

NextEra Energy Resources, LLC (NEER) is a wholesale electricity supplier based in Juno Beach, Florida.

In addition to wind and solar, NEER owns and operates generating plants powered by nuclear energy, natural gas, and oil.

The lawsuit involves the construction of Silver State South Solar Energy Center in Clark County, Nevada, which was completed in 2016.

[9] Pinal Central Solar Energy Center, the largest universal solar project in Arizona, was also opened in Pinal County, Arizona (20 MW) along with a 10-megawatt lithium-ion battery storage system after construction was completed by NEER in partnership with Salt River Project (SRP).

[11] As of May 2018, NEER has four natural gas plants in operation, all located in the Northeast region of the U.S., producing a net total of 420 megawatts (MW).

Hancock County Wind Energy Center in Hancock County, Iowa , with 148 Vestas V47-660 kW wind turbines for a total nameplate capacity of 97.68 MW. Half of the wind turbines are southwest of Klemme and the other half are south-southeast of Duncan . NextEra Energy owns the wind farm, which began operating in 2002