Keith railway station

[4] It was the point where the line from Inverness made an end-on junction with the Great North of Scotland Railway from Aberdeen (which opened in 1856)[5] to enable exchange of goods and passengers.

A signal box (which retains the name Keith Junction) remains at the eastern end to control a passing loop on the single track main line beyond the station, the now little-used goods yard (formerly used by trains accessing the nearby Chivas Regal whisky plant) and the stub of the Dufftown branch.

The line has since been preserved as the Keith and Dufftown Railway (reopening in 2000/01), but the link between it and the national network was severed by Railtrack in 1998 - two 60-foot track panels having been removed as a condition of the transfer of the branch to the K&DR.

[8] The preservation society hopes to reinstate the connection and the still-extant but disused section beyond to Keith Town at some point in the future and run through trains from here to Dufftown, which would see platform 1 return to regular use.

As of May 2022, There is a basic two-hourly frequency in each directions (with peak extras), to Inverness northbound and Aberdeen southbound, giving a total of 11 trains each way.

The exterior of the station