Kingston–Rhinecliff Bridge

It was designed by David B. Steinman and the builders were Harris Structural Steel and Merritt-Chapman & Scott Corporation, and is the second northernmost, and second newest, of the five bridges that NYSBA owns and operates.

The bridge has two main spans, since there is an east and west channel in the Hudson River at this point.

When the site was relocated about 3 miles (4.8 km) northward, there was no stable bedrock for anchorages, so the design was changed to a continuous under-deck truss.

In 2019, the bridge authority announced that tolls on its Hudson River crossings would increase each year beginning in 2020 and ending in 2023.

As of May 1, 2021, the current toll for passenger cars traveling eastbound on the Kingston–Rhinecliff Bridge was $1.75 in cash, $1.45 for E-ZPass users.