[2][3] In 2024, the MBTA tested a temporary freestanding accessible platform design at Beverly Depot.
These platforms do not require alterations to the existing platforms, thus skirting federal rules requiring full accessibility renovations when stations are modified, and were intended to provide interim accessibility at lower cost pending full reconstruction.
[4] Lincoln is planned to be part of the second set of non-accessible stations to be modified with the temporary platforms.
[6][5] Media related to Lincoln station (MBTA) at Wikimedia Commons This Massachusetts train station–related article is a stub.
You can help Wikipedia by expanding it.This article relating to the Massachusetts Bay Transportation Authority is a stub.