The line runs from east to west, and starts at Chuangxingang and ends at Xi'andongzhan.
The line is colored yellow-green on maps.
[1] While Phase 1 includes section from Epanggongnan to Xi'andongzhan, and Phase 2 includes Chuangxingang to Epanggongnan, both phase sections (except the three easternmost stations) are opened together on 28 December 2020.
The metro station at Xi'andongzhan is under construction.
[2] It will open at the same time as Xi'an East Railway Station.