Marangara Hydroelectric Power Station

Marangara Hydroelectric Power Station (French: Centrale Hydroélectrique de Marangara) is an 280 kilowatts (380 hp) run-of-the-river hydroelectric power station in the Ngozi Province of Burundi.

The project was financed by the Programme de réhabilitation du Burundi (PREBU).

[4] Farmers were compensated to move off the land above the hydroelectric dams, but they returned and resumed farming after a few years.

Farmers along the Ndurumu River cut down almost all the trees and planted crops such as cassava and banana.

Erosion waste was deposited in the supply channels and sometimes stuck to the turbines, causing damage.