Mariveles Coal-Fired Power Plant

The 600-MW facility was connected to the Luzon power grid on January 21, 2013.

[2] Two additional units are under construction, both with 600-MW capacity.

It was scheduled in early 2016 that the construction of the first unit which would cost P1 billion would commence.

[2] Aboitiz Power Corporation (AP), through their wholly-owned subsidiary Therma Power, Inc. acquired 66.1 percent ownership interest.

This article about a building or structure in the Philippines is a stub.