After multiple trial runs of Duhai - Meerut South RRTS stretch were conducted successfully, the section was opened on 18 August 2024, along with the existing 34-km Sahibabad-Modinagar North stretch of the RRTS.
[4][5][1] The National Capital Region Transport Corporation (NCRTC) had invited tenders for the construction of the Meerut South RRTS station along with the 21.5 km long Murad Nagar–Meerut South section of the 82.15 km Delhi-Meerut RRTS line.
L&T Heavy Civil Infrastructure emerged as the lowest bidder for construction work.
Under the agreement, companies started construction of Meerut South RRTS station.
The rail tracks as the viaduct is situated at a height of 24 meters above the ground level.