The project formally began in 2016 when the city solicited design ideas; it selected a winning proposal in 2017.

The market currently occupies an adjacent building, with the project site utilized as a 130-space surface parking lot.

The market currently occupies an adjacent building, with the project site utilized as a 130-space surface parking lot.

[1] Seven teams of developers presented ideas; the winning proposal, "Market Tower" by Wood Companies and Schiff Capital Group, was chosen in April 2017, over designs by the Pizzuti Companies, Nationwide Realty Investors, Kaufman Development, Flaherty & Collins, Casto, and Lifestyle Communities.

[7] The winning design was initially proposed to have 35 stories, with a square floorplan and an exterior predominantly made of tall glass panels.

[9] At the time the winning project was announced, it was proposed for construction to take place from 2018 to 2020 at a cost of $120 million.

[13] In September 2021, changes were made to the project, including increasing the number of floors to 31, making it potentially the tallest building constructed in the city since 1990.

The building will replace a surface lot used by North Market
North End Market House
(1876-1948)
The second North Market
(1948-1995)
The building worksite in April 2023