[2] The wind farm began exporting power in June 2021.
However, as market prices had increased above the CfD price due to the 2021 United Kingdom natural gas supplier crisis, the operator deferred the CfD start.
The wind farm uses three 220 kV AC export cables to transmit generated power to the national grid.
[6] The operations and maintenance base for the wind farm is located in Fraserburgh.