Muyinga Hospital

[5] As of 2018 it had one of six laboratories in the East African Community that could measure HIV viral load in blood.

[4] The hospital's generator was inadequate and there were routine power cuts, causing serious danger to patients in surgery and babies in neonatology dependent on oxygen.

The United Nations Development Programme obtained funding from the European Union, Belgium, France, Switzerland and the Netherlands to obtain a new 250 KVA generator for the hospital, which was installed in December 2018.

[4] In 2022 the hospital's operating theatre was renovated by a consortium of Memisa, Médecins Sans Vacances, Louvain Coopération and Enabel.

The new theatre replaced a small, cramped and dilapidated room built in the 1990s, and included operating tables, lighting and surgical equipment.