NHPC

Recently it has expanded to include other sources of energy like solar, geothermal, tidal, and wind.

Baira Suil Power station in Salooni Tehsil of Chamba district was the first project undertaken by NHPC while Chamera-1 is the best.

[2] Since its inception in 1975, NHPC has grown to become one of the largest organisations in the field of hydropower development in the country.

Government Total – 4425 MW *Under JV through Chenab Valley Power Projects (P) Limited, in Kishtwar District of J&K.

The Scheduling and dispatch of all the generating stations owned by National Hydro Power Corporation is done by the respective Regional Load Dispatch Centres which are the apex body to ensure the integrated operation of the power system grid in the respective region.

All these load dispatch centres come under Power System Operation Corporation Limited (POSOCO).

Nimoo Bazgo Dam
Teesta Low Dam-IV, West Bengal