New Bridge, Mitrovica

[5] Today the bridge is open to pedestrians and there are only Carabinieri patrols from KFOR-MSU and Kosovo Police, but there is no longer any checkpoint.

[7] Structural operations such as the widening of the central pier, the reconstruction of the slab and pavements made of concrete and the replacement of the bearings and expansion joints were performed on the 100-meter-long (330 ft) bridge construction.

The Department of Transport and Infrastructure - a division of the UNMIK Joint Interim Administrative Structure (JIAS) - oversaw the bridge contract.

At the end of June 2001, the finished bridge, at the final cost of DM 3 million was handed over to the City of Mitrovica.

Since 2012 the northern and southern edges of the bridge have been patrolled 24/7 by Italian Carabinieri from KFOR-MSU to maintain peace and stability in the area and to deter illegal activities.

First snow on the main bridge in Mitrovica.
KFOR - MSU Carabinieri Patrols, in front of the renovated Ibar Bridge, in Mitrovica , Kosovo . (2019).