Newbie Junction Halt railway station

In 1929, the Newbie Brick and Tile Works closed and the railway was demolished,[5]and housing was constructed for the boiler factory employees.

"[7] The halt stood on a double-track section of track and the mineral branch was served by trains from the west.

[9] A network of lanes joined the station site with the nearby factories via Milnfield and a path running beside the River Annan.

The single-track Newbie Branch line ran into the boiler factory, which has now been mostly lifted; nothing remains of the halt.

The large factory site is partly camouflaged by tree plantations and some unused tracks remain in situ within the works itself.

System map of the public passenger stations on the line