In 1929, the Newbie Brick and Tile Works closed and the railway was demolished,[5]and housing was constructed for the boiler factory employees.
"[7] The halt stood on a double-track section of track and the mineral branch was served by trains from the west.
[9] A network of lanes joined the station site with the nearby factories via Milnfield and a path running beside the River Annan.
The single-track Newbie Branch line ran into the boiler factory, which has now been mostly lifted; nothing remains of the halt.
The large factory site is partly camouflaged by tree plantations and some unused tracks remain in situ within the works itself.