The Sherbino Mesa Wind Farm is located in Pecos County in west Texas.
Phase I utilizes 50 Vestas V-90 Mk.5 wind turbine generators, each with a rated capacity of 3 MW.
BP will operate phase I of the project.
[1] Phase II, located on a 20,000-acre (8,100 ha) site 40 miles (64 km) west of Fort Stockton, utilizes 60 Clipper Windpower C-96 wind turbines, each with a rated capacity of 2.5 MW.
This phase will be in operation by the end of 2011.