Originally commissioned with a gravel surface, it was paved in the 1970s.
SH-133's southern terminus is at SH-19 seven miles (11 km) northeast of Pauls Valley.
[2] The highway ends two miles (3.2 km) north of the county line at SH-59 between Rosedale and Byars.
[3] SH-133 first appeared on the 1959 state highway map,[1] implying it was commissioned in either late 1958 or early 1959.
Originally, the route was entirely gravel-surfaced[1] but by 1963 the Garvin County portion had been paved.