Pattiseema Lift Irrigation Project

[6] The bold decision taken by chief Minister Chandrababu Naidu has helped thousands of farmers cultivating 1.3 million acres in navin delta which faces water shortage in the period June to August.

[7] The water pumped into canal from River Godavari would take 7 – 8 days to reach Prakasam Barrage after travelling by Gravity for about 160 km.

The Polavaram project got delayed and Chandra Babu Naidu started pattiseema and linked through Right canal to bring water to Krishna.

In 2015 as part of trial run it has lifted 8.8 tmc of godavari water to krishna delta which saved standing crops worth Rs2,500 crores during dry spell.

Chief Minister Chandrababu Naidu had been showcasing PLIS as the first project interlinking two major rivers (Godavari and Krishna) in the country.

Inauguration of the Pattiseema Lift Irrigation Project
Inauguration of the Pattiseema Lift Irrigation Project
Godavari water being released into canal (drone view)