Pickerill and Juliet gas fields

The fields are located about 66 km (41 mi) east of Spurn Head, Lincolnshire.

[5] New pipeline reception facilities and process plant was installed at TGT as part of the Pickerill development.

[2] The Juliet development comprised two subsea wells and their wellhead protection structures (WHPS) producing to a manifold centre.

[4] From the manifold well fluids flowed to Pickerill A via a 22 km long 12” diameter pipeline (PL3121).

Reception facilities (the Juliet emergency shutdown valve and a temporary pig receiver) at Pickerill A were located on a sub-cellar deck.

[3]The cumulative gas production from Pickerill from 1992 to the end of 2014 was 12,315 million cubic metres.