The power station is divided into two phases with phase one consisting of two 660 MW units, each with scrubbing systems and cooling towers.
[1] Phase two has one ultra-supercritical secondary reheat unit with a 1350 MW capacity.
This unit is one of the single largest coal units in the world; it also has the world's largest cooling tower with a height of 210 m (689 ft).
[2] The engineering and design works for the power station were completed by East China Institute of Energy.
The Phase 2 unit has a coal consumption rate of 251g/kWh.