It occupies 7,500 acres (3,000 ha) of land and water with 43 miles (69 km) of waterfront and adjoins the separate Port of Long Beach.
That sticky process is described in Two Years Before the Mast by Richard Henry Dana Jr., who was a crew member on an 1834 voyage that visited San Pedro Bay.
The Southern Pacific Railroad and Collis P. Huntington wanted to create Port Los Angeles at Santa Monica and built the Long Wharf there in 1893.
[12] The opening of the Vincent Thomas Bridge in 1963 greatly improved access to Terminal Island and allowed increased traffic and further expansion of the port.
The port is under the control of a five-member Board of Harbor Commissioners appointed by the mayor and approved by the city council, and is administered by an executive director.
They meet the ships waiting to enter the harbor and provide advice as the vessel is steered through the congested waterway to the dock.
[16] The port's top trading partners in 2019 were: The most-imported types of goods in the 2019 calendar year were, in order: furniture (579,405), automobile parts (340,546), apparel (312,655), and electronic products (209,622).
In 2011, no American port could handle ships of the PS-class Emma Mærsk and the future Maersk Triple E class size,[17] the latter of which needs cranes reaching 23 rows.
[6][7] The World Cruise Center, located in San Pedro, Los Angeles, beneath the Vincent Thomas Bridge, has three passenger ship berths.
With miles of public promenade and walking paths, acres of open space and scenic views, the LA Waterfront attracts thousands of visitors annually.
Heavy-duty diesel trucks, that are also part of the freight-moving port complexes, emit exhaust with nitrogen oxides and particulate matter.
[30] In 2021, the South Coast Air Quality Management District required warehouses in the port which do not cut emissions of carbon and pollutants to pay fees.
[34][35] The $2.8 million San Pedro Bay Ports Clean Air Action Program (CAAP) initiative was implemented by the Board of Harbor Commissioners in October 2002 for terminal and ship operations programs targeted at reducing polluting emissions from vessels and cargo handling equipment [citation needed].
To accelerate implementation of emission reductions through the use of new and cleaner-burning equipment, the port has allocated more than $52 million in additional funding for the CAAP through 2008.
As of May 2016, the Port of Los Angeles has already surpassed its initial 2023 emission goals 8 years ahead of predicted time frame.