Both Iowa cities that make up the region have their own systems, several MetroLINK routes connect with Davenport CitiBus, and Bettendorf Transit.
1998 saw the introduction of Channel Cat ferry service on the Mississippi River, while Compressed Natural Gas buses first appeared on the streets in 2002.
The facility was completed in April 1998 as a part of the John Deere Commons Development with a 12 bay, 12,000 square foot terminal.
[4] In the future, the Centre Station is planned to become a passenger rail hub as part of the Quad Cities train project.
The station, built in 2006, offers an indoor waiting area with restrooms and real-time signage, and is also equipped with a high tech community room that is available for local events.
The stop, which provides direct connections with the South Mall Entrance, features a covered waiting area with platform, windbreaks with seating, real-time LED signage, lighting, and landscaping.