[3] A new 75 km-long railway line was constructed between Asthal Bohar station that lies on Rohtal–Delhi railway line and Rewari via Jhajjar.
The construction required 124 bridges over canals, drains and irrigation water courses, 36 level crossings, 32 limited-height subways and 4 bridges over roads.
[4][5][6][7][8] Two express trains connecting Chandigarh with Jaipur also run on this railway line.
India's first train running on compressed natural gas (CNG) started on Rewari–Rohtak line in January 2015.
[9][10] This line is part of the following proposed NCR's Regional Orbital Rail Corridor (RORC) will pass through here: