[2] The name may derive from *hūl, an element related to *hū- meaning "boil, soak, seethe" (< Old Celtic *seu-; c.f.
After the junction, it becomes the River Hull or the West Beck and flows to the east, before turning south to reach Corps Landing.
A number of fish-weirs made navigation difficult, and the Archbishop negotiated their removal in 1296, so that a wharf could be established at Grovehill to serve the town of Beverley.
Further upstream, channels were cut through the fens in the twelfth and thirteenth centuries by the monks of Meaux Abbey, primarily to enable travel by boat, but these gradually became part of the drainage system.
[12] John Smeaton, when asked by the merchants of Driffield to advise on ways to allow keels to reach their town, suggested a small cut of about 1.2 miles (1.9 km) including one lock, from the river near Wansford.
The merchants sought a second opinion, and John Grundy, Jr. suggested a much longer canal, running for 5 miles (8.0 km) from Fisholme on the Frodingham Beck.
When fully opened in 1770, the new route was some 3 miles (4.8 km) shorter than the river, which follows an extremely winding course in its upper reaches.
[14][15] Although beyond their jurisdiction, the navigation commissioners attempted to extend their powers, to improve the river below the junction with Aike Beck.
The bridge cost £500, half of which was met by Richard Bethell, the owner of the Leven Canal, on condition that the tolls for passing through it were reduced significantly.
In 1794, the merchants of Beverley had advocated the building of docks at Hull, with a separate entrance, so that traffic to the upper river would not be impeded, while the Driffield Navigation had unsuccessful attempted to get a clause inserted into the act of Parliament[which?]
The upgrade included a new drive mechanism, which raises and lowers the gate, and pivots it when it is at the top of the structure, so that it lies horizontally rather than vertically.
[17] Plans have been considered to build a barrage at the mouth of the Hull where it joins the Humber Estuary to maintain a constant water level as it passes through the city.
The idea was first raised by the Abercrombie report, which considered how to redevelop Hull after significant destruction during the Second World War.
The main cargoes on Beverley Beck in 1730 were coal, bricks, turfs and wool, together with cereal crops, consisting of wheat, barley, oats and malt.
[21] There was a steady expansion of trade on the Driffield Navigation during the same period, as the dividends paid to shareholders rose from 1.5 to 4 per cent.
Three return trips each week were made, but the journey times were too long, and an advertisement in 1825 indicated that the engine had been altered and an express steam packet service would commence.
Coal and other minerals accounted for around one quarter of the traffic in 1905, while goods carried in 1906 included fertiliser, burnt ore, flour and scrap metal.
John Grundy worked on plans for the scheme which would protect 11,000 acres (4,500 ha) of low-lying land to the north-east of Hull.
John Hoggard acted as Superintendent for the scheme, while Joseph Page was appointed as resident engineer, to oversee the construction of the drains and the outfall sluice.
Grundy made regular visits until October 1767, by which time the sluice and the main drainage channels were completed, at which point he and Page moved on, while Hoggard oversaw additional work on the drains and banks, which lasted for several more years.
[28] Despite the Holderness scheme, there were still problems near Leven and Weel, and William Jessop spent a month inspecting the area before writing a report in July 1786.
Chapman was appointed as engineer for the scheme, which would cost £115,000, and would provide flood defences and drainage for 12,600 acres (5,100 ha) of land to the west of the river.
At Hull, an outfall sluice was constructed, and the drain passed through tunnels under eleven waterways, including the Beverley Beck.
[48] In 2018, Banksy visited this bridge and left a piece of graffiti to honour Hull's year as City of Culture.
[83] A cofferdam was built on the east bank, and the cutting which would have provided access to the twin-bore tunnel was nearly excavated when a 6.6-foot (2.0 m) hole appeared in the river bed, and the entire site flooded.
The tunnel was officially opened on 21 August 2001, when a Mini car was driven through it, recreating scenes from the film The Italian Job.
Two jack screws enabled the deck to be raised or lowered in relation to the pontoon, so that it remained at approximately the same height, whatever the state of the tide.
[87] When a boat needed to pass, the west end was freed, and the pontoon swung round to lie parallel to the bank, either upstream or downstream, depending on the state of the tide.
Because the ferry rights had been in existence for more than 600 years, an Act of Parliament was needed, and this was thwarted by a petition containing 84 signatures, presented by the people of Weel to the House of Lords.
Once the Tickton Bypass bridge had been built a short distance upstream, it no longer needed to carry road traffic, and it was replaced by a footbridge in 1976.