Segesta (Milan Metro)

Segesta is a station on Line 5 of the Milan Metro.

The works for the construction of the station began in November 2010,[2] as part of the second section of the line, from Garibaldi FS to San Siro Stadio.

Segesta is an underground station with two tracks served by an island platform and, like all the other stations on Line 5, is wheelchair accessible.

For the construction of this station, a special construction method, called Massive Milan, was used to reduce train vibrations.

You can help Wikipedia by expanding it.This article about an Italian railway station is a stub.