A sequence step algorithm (SQS-AL) is an algorithm implemented in a discrete event simulation system to maximize resource utilization.
For each sequence step, each replication loop is a simulation run that collects crew idle time for activities in that sequence step.
The collected crew idle times are then used to determine resource arrival dates for user-specified confidence levels.
The process of collecting the crew idle times and determining crew arrival times for activities on a considered sequence step is repeated from the first to the last sequence step.
This algorithms or data structures-related article is a stub.