Serpentine Pipehead Dam

The dam is also used to store water from the Dandalup scheme whereby water can be pumped or gravity transferred back into the Serpentine Pipehead Dam.

The dam site also contains a water treatment plant and picnic area.

The pipehead dam is 7 km (4.3 mi) upstream from Serpentine Falls and was constructed in the late 1950s, opening in 1957.

The dam utilized 5,000 cubic metres (180,000 cu ft) of concrete and 10,000 cubic metres (350,000 cu ft) of earth.

You can help Wikipedia by expanding it.This article about a dam or floodgate in Australia is a stub.

Serpentine Pipehead Dam
Serpentine Pipehead Dam