The brief requested a design to accommodate 300 male and 300 female patients, and following standard practice they would lead segregated lives from one another on opposite sides of the asylum.
[4] Brown's used a small 0-4-0 Tank engine called Weaver (Manning Wardle H-class 1072) to transport both men and materials to the construction site.
A system of brass tokens was introduced with face values from ½d to 4/- each denomination varied in shape from circular, oval, hexagonal and octagonal.
[2] After closure in 2002, the entire site was sold to Redrow plc, which developed a modern housing estate in the former grounds, renovating the old and now listed hospital buildings into apartments.
Passenger services ceased in 1920, while coal traffic to power the sites four Lancashire steam boilers continued until December 1954, when delivery by road took over.