[3] The old box pews and rotten flooring were removed, the plaster cleared from the walls, the caps and bases of piers were cleaned and renovated.
The stonework inside the church was repaired and pointed.
The glazing and stonework was renewed, and a new heating system by Haden was introduced.
The floor was laid with wood blocks on concrete, the nave, aisle tower and porch were repaired with Hopton stone.
A new altar table, pulpit, lectern and choir seating were provided.